The Tauhara Geothermal Project involved the construction of a 174MW geothermal project station in Taupo, New Zealand, developed by Contact Energy and Tauhara Moana Trust.
Brownfield Site Demolition
Live environment demolition works
Confined space entry
Working at heights
Coordination of activities to maintain operations efficiency and safety protocols
Fabrication
Pipe spooling
Scrubber vessels
Hot water suction header
Installation of Critical Components
Steam Turbine
Turbine auxiliaries
Chemical treatment system
Generators
Colling Towers
Piping systems
Heat exchangers
Scrubber vessels
Free issue parts
Demolition/Removal of Mechanical Equipment including:
Decommissioning and removal of existing large bore pipework
Pipe fabrication and installation including:
Spooling and installation of free issue Carbon and Stainless Large/Small bore piping for water lines, including cooling and process water systems, control oil piping, Instrument Air piping, gland steam, compressed air, GES (Gas extraction system) and ejector piping.
Installation of underground and above ground FRP large bore piping to Cooling tower.
Fabrication and installation of the Ceco Scrubber Vessels and connections.
The piping systems for transporting water from the geothermal reservoir to the power station and vice versa.
Installation of low-pressure gas piping
Coded pipe welding covering a range from 15 nominal bore to 1250 mm, utilising materials such as stainless steel, carbon steel, and low-temperature carbon steel.
Integration of piping systems with other mechanical components to ensure efficient operation of the geothermal power station
Installation of critical components including:
Steam turbine generator supplied by Fuji Electric – the world’s biggest single-turbine geothermal power unit at 174 MW
Hotwell pumps to main cooling system
Chemical treatment system
Installation of Condensers x 2 including methodology changes once they arrived in NZL.
Installation of generators
Fabrication and installation of 3500NB Hot water suction header.
Installation of induced draft cooling towers risers only and associated infrastructure.
Fabrication and installation of piping systems for transporting water between the geothermal reservoir and the power station.
Installation of heat exchangers for transferring heat between water and steam or air, along with various mechanical components such as valves, fittings, and gaskets.
Brownfield Site Demo, Fabrication and Installation at Geothermal Facility
End to end demolition to installation of a new geothermal plant in New Zealand.