Fuel Gas Waste Heat Boiler

At very short notice, our client engaged DIALOG Fitzroy to provide a Fuel Gas Waste Heat Boiler.
Mechanical Design and Engineering
Procurement
Fabrication
Insulation
Installation
3D laser scanning of the assembly
Finite Element (FEA) and Computational Fluid Dynamics (CFD) analysis to determine what the dimensions would be when the economiser assembly is in its cold position.
Creation of Fabrication/Desing drawings of the existing economiser assembly which had contradictory information and were not “as-built” at the time of the existing economiser installation.
Short timeline procurement of components based on drawings and to meet short fabrication timeline
Fabrication painting, insulation and installation of the Fuel Gas Waste Heat Boiler economiser assembly, inlet, outlet, vent and drain piping, to replace the existing economiser assembly.